
Chapter 4 _______________________________________________________________ Installation
VAISALA_______________________________________________________________________ 83
Finalizing the Installation
Finalize the installation as described in the following steps:
1. To be able to release the rain gauge's tipping bucket mechanism,
and adjust the level, first remove the funnel from its base by
unscrewing the three plastic thumbscrews (1). See Figure 70 on
page 83.
0201-036
Figure 70 Funnel Fixing Screw
2. Remove the piece of foam (2) from under the bucket mechanism.
This foam may be saved and used whenever the rain gauge is
moved. See Figure 71 on page 83.
0201-037
Figure 71 QMR102 Adjustment and the Foam Location
Komentáře k této Příručce